Mounting the monitor on manhole rung – ADS Environmental Services IETG FlowHawk QR 775012 A4 User Manual

Page 281

Advertising
background image

7-2

IETG FlowHawk Manual

Mounting the Monitor on Manhole
Rung

The simplest way to mount a monitor in a manhole is to attach it to
a rung. FlowHawk monitors come with a standard hook for this
purpose.

Make sure the rungs are capable of holding the weight of the
monitor and cables. The monitor weighs 13.7 kilograms (30.3
lbs) with added weight coming from the cables.

The hook must be closed to prevent accidental dislodging from
its support rung. The hook has two pieces, a curved portion
that goes over the rung and a straight portion which closes the
hook underneath the rung. The hook must be closed and the
clamping bolt/nut tight enough to ensure that the straight
closure remains in position.

SERVICE LOOP

SHOWN FOR CLARITY)

GSM ANTENNA

CABLE(S) ANCHORED TO WALL

MOUNT

MANHOLE

(ONLY ONE CABLE

BURIED

RIM

LADDER RUNG

GSM MODULE

FLOWHAWK MONITOR

ANTENNA CABLE

FlowHawk monitor secured to a manhole rung

Advertising