ADS Environmental Services IETG FlowHawk QR 775012 A4 User Manual

Page 300

Advertising
background image

8-16 IETG FlowHawk Manual

15. (applicable only when using a GSM Module) Reconnect the

communication cable from the GSM Module to the COMM
port on the monitor.

Note: Do not reconnect the communication cable to the
monitor while the monitor is taking a reading. This could
damage the monitor.

16. Establish communication with the monitor remotely or on site

using the IS PC Communication cable (p/n 8000-0054) to
verify communication and check the new battery voltage. The
internal voltage should now be well above 7.5 volts. Refer to
Connecting Directly to the Monitor in the Chapter 4,
Communication, for instructions on attaching the IS PC
Communication cable to the monitor and laptop computer.

17. Finger-tighten the top bolts to make sure the top and gasket are

seated properly. Then, tighten the bolts about halfway to full
torque value by tightening the opposite bolts. Finally, tighten
the bolts to approximately 3.39 Nm (30 in-lbs/2.50 ft-lbs) to
fully secure the top to the canister. If the monitor will not seal,
loosen the bolts and check for a trapped wire or debris on either
the gasket or the lip. You can increase the torque value on the
bolts incrementally to assist in sealing. However, tighten the
bolts evenly to prevent distorting the gasket and do not exceed
5.0843Nm (45-inch pounds)
.

18. (applicable only when using a GSM Module) Wrap rubber

stretch tape around the entire communication cable/COMM
port connection, extending 1 to 2 inches onto the cable beyond
the connection.

Advertising