MTS Model FlexTest SE User Manual

Page 54

Advertising
background image

Models FlexTest® IIm/GT/SE Controller Hardware

Connecting Electrical Power

Installation

54

The AC power ground is through the power cord. The power cord must be
plugged into both the chassis and the power source for proper grounding.

Proper grounding is required for safe operation.

It is also required to meet EMC emission and susceptibility requirements.

System ground cable

(PN 005-402-3xx) connected to

the test frame or other

components.

Rack Mount Configuration

Signal common cable

(PN 037-766-101) connected

to the power panel.

Chassis ground cable

(PN 037-766-102) connected
to the vertical conductive rail.

CAUTION

Advertising
This manual is related to the following products: