Edwards Signaling eFSA250 User Manual

Page 11

Advertising
background image

E-FSA64 and E-FSA250 Technical Reference Manual

ix

3. Install the panel backbox. See “Panel backbox installation” on page 2 for

backbox dimensions.

4. Install the panel electronics in the panel backbox. See “Panel electronics

installation” on page 3.

5. Remove the clear protective plastic from the front panel display.
6. Install the optional panel accessories. Refer to each component’s installation

sheet instructions.

7. Review Chapter 1 “Installation and wiring” starting on page 1.

WARNING:

Make sure that the AC power circuit breaker is off before

connecting wires to the terminal block.

8. Connect the field wiring. Meter for opens, grounds, and shorts before

connecting.

9. Connect AC power and ground wiring. See “AC power wiring” on page 5. The

panel cannot be started on batteries only.

10. Connect panel low voltage wiring. See “Panel low voltage wiring” on page 6.
11. Turn on AC power.
12. Connect the batteries. See “Battery wiring (TB8)” on page 7.
13. Program the panel. See Chapter 2 “Front panel programming” on page 29. If

you are using the configuration utility, refer to the online help.

14. Test the system for proper operation.

Advertising
This manual is related to the following products: