Install handrails to posts – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1842 User Manual
Page 48
Advertising
![background image](/manuals/277528/48/background.png)
7. Rest Platform
48
PNEG-1842 42"-48" Bucket Elevator Platform and Ladder “X” Series
Install Handrails to Posts
1. Connect the handrails to the top two (2) slots in the posts using 5/16" x 2" HHCS bolt (S-7877) and
5/16" flange nuts (S-3611).
Figure 7M 42"/48" Rest Platform Handrails
Advertising