Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1842 User Manual

Page 54

Advertising
background image

8. 42" Head Platform Left Hand Drive

54

PNEG-1842 42"-48" Bucket Elevator Platform and Ladder “X” Series

Attach Toe Board Channels to Cross Support Channels

1. Position the toe boards (HSP42018X) along the side of the lower head.

2. Align toe boards with the support channels as shown in

Figure 8C below and

Figure 8D on Page 54

.

3. Fasten to channels using four (4) 5/16" x 1" flange bolts (S-7470) and nuts (S-3611).

4. Install middle toe board (HSP42064X) to the end of the side toe boards using 1/2" x 1" HHCS bolts

(S-7935) and 1/2" flange nuts (S-8506).

Figure 8D

Advertising