8. 42" Head Platform Left Hand Drive

PNEG-1842 42"-48" Bucket Elevator Platform and Ladder “X” Series

61

Install Toe Boards

1. Install the longest toe board assemblies (HSP42015X and HSP42016X). Orient so that the

(HSP42015X) faces towards the down-leg end of the lower head.

2. Fasten toe boards to the support channels using 5/16" x 1" flange bolts (S-7440) and 5/16" flange

nuts (S-3611).

3. Install each end of the long “Z” toe board assembly to the bottom of the long toe board assemblies

using 5/16" x 1" flange bolts (S-7440) and 5/16" flange nuts (S-3611).

4. Install the “Z” toe board (HSP42037X) on the drive side at the down-leg end. Fasten to the ends

of the toe boards (HSP42015X and HSP42018X) using 5/16" x 1" flange bolts (S-7440) and
5/16" flange nuts (S-3611).

5. Install the “Z” toe board (HSP42036X) on the hatch side at the down-leg end. Fasten to the ends

of the toe boards (HSP42015X and HSP42018X) using 5/16" x 1" flange bolts (S-7440) and
5/16" flange nuts (S-3611).

(See Figure 8K.)

Figure 8K