Install third cross support channel – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1842 User Manual

Page 60

Advertising
background image

8. 42" Head Platform Left Hand Drive

60

PNEG-1842 42"-48" Bucket Elevator Platform and Ladder “X” Series

Decking Section: Up-Leg Hatch Side

1. Install three (3) planks of decking (HSP42008X) on the hatch side at the up-leg end. NOTE: Be sure

to install this section of decking by starting at the inside next to the toe board and working outward.

2. Fasten the decking to the support channels (HSP42032X and HSP42012X) using 5/16" x 1" flange

bolts (S-7470) and 5/16" flange nuts (S-3611).

Install Third Cross Support Channel

1. Install the 40" support channel (HSP4248HS) to the end of the decking planks (HSP42008X) and the

bottom of the toe board (HSP42018X) using 5/16" x 1" flange bolts (S-7470) and 5/16 flange nuts
(S-3611).

(See Figure 8J.)

Figure 8J

Advertising