Initializing a new ern – Brocade Multi-Service IronWare Switching Configuration Guide (Supporting R05.6.00) User Manual

Page 546

Advertising
background image

516

Multi-Service IronWare Switching Configuration Guide

53-1003036-02

Initializing a new ERN

15

•

Hold-off timer — Each ERN uses a hold-off timer to delay reporting a port failure. When the
timer expires, the ERN checks the port status. If the issue still exists, the failure is reported. If
the issue does not exist, nothing is reported.

•

Message interval — This is an operator configurable feature for sending out R-APS messages
continuously when events happen.

Initializing a new ERN

A newly configured Version 2 ERP topology with four ERNs initializes as described in this section.
The ERNs have the following roles:

•

ERN 2 is the RPL owner.

•

ERNs 1, 3, and 4 are non-RPL nodes.

Figure 128

shows the first step of initialization beginning from ERN 4, a non-RPL node. The actions

of each ERN are:

•

ERN 1 takes no action. Both ports are in the forwarding state.

•

ERN 2 (RPL owner) takes no action. Both ports, including the RPL port, are in the VLAN port
forwarding state.

•

ERN 3 takes no action. Both ports are in the forwarding state.

•

From the Init state ERN 4 stops all timers (guard, WTR, WTB), blocks the left port, unblocks the
right port, transmits R-APS (NR) messages, and enters the Pending state.

FIGURE 128

Initializing an ERN topology - I

Figure 129

shows the next sequence of events. Next, ERN 1 initializes. The actions of each ERN

are:

•

ERN 1 stops all timers (guard, WTR, WTB), blocks the left port, unblocks the right port,
transmits R-APS (NR) messages, and enters the Pending state.

•

ERN 2 takes no action. Both ports are in the forwarding state.

•

ERN 3 takes no action. Both ports are in the forwarding state.