Brocade Multi-Service IronWare Switching Configuration Guide (Supporting R05.6.00) User Manual

Page 548

Advertising
background image

518

Multi-Service IronWare Switching Configuration Guide

53-1003036-02

Initializing a new ERN

15

Figure 131

shows the next sequence of events. The actions of each ERN are:

ERN 1, from the Pending state, unblocks the left interface, stops sending R-APS (NR) and stays
in the Pending state. Now both interfaces are in the forwarding state.

ERN 2 takes no action.

ERN 3 takes no action.

ERN 4 stays in the Pending state and transmits R-APS (NR) messages. The left interface is
blocked, and the right interface is in the forwarding state.

FIGURE 131

Initializing an ERP topology - IV

Figure 132

shows the next sequence of events. Next ERN 2 initializes. The actions of each ERN are:

ERN 1 stays in the Pending state.

ERN 2 (RPL owner), from the Init state, stops the guard timer, stops the WTB timer, blocks the
RPL, unblocks the non-RPL port, enters the Pending state, transmits R-APS (NR) messages,
and starts the WTR timer.

ERN 3 takes no action.

ERN 4 stays in the Pending state and transmits R-APS (NR) messages. The left interface is
blocked.

FIGURE 132

Initializing an ERP topology - V

Advertising