Removing and installing throttle rail – BMW K 1100 LT/RS User Manual

Page 130

Advertising
background image

13.12

Removing and installing throttle rail

•

Remove fuel tank.

•

Remove left fairing side section.

•

Remove left-hand heat-insulating bulkhead.

•

Release fuel hose (1) at injection rail.

•

Release injection rail (2) at cylinder head and pull
out together with injectors.

•

Disconnect multiplug at throttle sensor.

L

Note:

Only remove throttle sensor if it is to be replaced
(basic setting necessary).

•

Detach throttle cable (3).

•

Detach operating cable (4) for start speed in-
crease.

•

Release hose clips at the air intake lines, loosen
at the throttle coupling.

•

Remove throttle rail from stub pipe.

•

Pull air return pipe (5) off throttle rail.

•

Disconnect indicator lamp plug connection for
start speed increase.

•

Install in the reverse order of removal.

L

Note:

Do not change the location of the hose clips on the
throttle coupling unions.
Firmly tighten hose clips at the air intake lines with
special tool, BMW No. 31 1 500.

LT130100

1

3

4

2

LT130110

5

Advertising