Installing frame – BMW K 1100 LT/RS User Manual

Page 324

Advertising
background image

46.22

Installing frame

Installation basically takes place in the reverse
order of removal.

Place frame on drive train and firmly tighten
screws and bolts in the specified order.

1. Screw in all 5 screws loosely, i.e. not as far as

they will go. Fit a 1 mm thick spacer ring, inner
support ring at the front right between the cylin-
der head and frame strut.

2. Firmly tighten screws 1,4 and 3.
3. Measure distance at front left and fit outer sup-

port ring, firmly tighten screws.

4. Measure distance of mounting point on interme-

diate flange and firmly tighten screw.

X

Tightening torque:

Frame to engine ........................................... 45 Nm

Install telescopic fork and adjust steering.

Setting torque:
Hexagon nut................................................ 12 Nm

New bearing adjustement procedure:
Pre-tighten hexagon nut to........................... 25 Nm
Move steering from stop to stop several times,
loosen hexagon nuts, retighten .................... 12 Nm

X

Tightening torques:

Locking tube ................................................ 65 Nm
Hexagon nut ................................................ 65 Nm
Clamping screws of fork bridge.................... 15 Nm
Clamping block for handlebar ...................... 22 Nm

Setting dimensions:
Clutch play at handlebar
lever ....................... 4 ± 0,5 mm (0.157 ± 0.0197 in)
Cable length at clutch release
lever ............................ 75 ± 1 mm (2.953 ± 0.04 in)
Accelerator cable play............. 0,75 mm (0.0295 in)

Carefully fill and bleed brake system

X

Tightening torques:

Brake line to handbrake cylinder .................. 11 Nm
Brake line to distributor ................................ 11 Nm
Brake line to brake caliper.............................. 7 Nm
Bleed screw ................................................... 7 Nm
[ABS II] Pressure modulator to holder ......... 17 Nm

LT460300

2

3

4

1

5

Advertising