Attenzione attention – JLG X23J Operator Manual User Manual

Page 101

Advertising
background image

97

BOOM LIFT MODELS X23J

JLG

X23JR0620113

Pay maximum attention to the obstacles that may collide with the various machine
parts when moving. Before carrying out ANY movement make sure that nothing can
interfere with ANY machine part (branches, projecting parts of constructions, etc.).

It is prohibited to use the machine by introducing objects into the basket that offer a large
surface for the thrust of the wind (e.g. large signs) even if they are within the machine’s
capacity limits.

OPERATIONAL PHASES FOR THE ROUTINE MOVEMENT OF THE AERIAL PART

Before moving the aerial part, make sure that:

All provisions stated in this chapter have been respected

There are no obstacles in the work area.

All necessary conditions have been verified for working at a height:

The machine is stabilised and levelled: icon 5 visible on display.
The weight in the basket is below the maximum admitted.
The remote control is positioned in the basket.

The basket access ladder has been folded into the raised position so as not to risk

contact during movement of the aerial part.

The aerial part can ONLY be moved from the control position in the basket

Select the engine revs depending on necessity and by checking the selection on the
display.

Operate on Joysticks 2, 3, 5, 6, 7 to move the aerial part as reported in paragraph regar‑
ding the controls’ description.

The use of the JIB arm is possible only if the operative load is less or equal to 120 kg.

ATTENZIONE

ATTENTION

0

6

0

4

1

3

00

Advertising