JLG X23J Operator Manual User Manual
Page 95
91
BOOM LIFT MODELS X23J
JLG
X23JR0620113
The complete closure and alignment is displayed by the arrows on the machine itself
(SEE PHOTO) and the display of the icon in position 6 on the remote control
‑
Stabilisation can be carried out from the control position in the basket or on the ground.
If controlled from the ground, make sure there is complete visibility of the trajectory of
each individual outrigger before moving it and check that at the end of the stabilisation
phase the distance between the ground and the lower limit of the basket access ladder is
less than 40cm. If this is not the case, approach the ladder to the ground and carry out
the basket stabilisation procedure.
‑
Select the engine revs. depending on necessity and check selection on the display.
Always perform stabilisation slowly.
‑
Press and hold button 7 – self destabilization (see relevant paragraph).
If the movements are selected with the machine not completely closed and aligned, an
error message will appear on the display.