JLG X23J Operator Manual User Manual

Page 78

Advertising
background image

the choice is of the employer or/and user.

Before starting to work, the operator must check the perfect working order of all safety
devices, the efficiency of the main mechanical parts and the level of fuel and hydraulic
oil.

Never operate on soft, rough, slimy grounds or with slopes that exceed the accepted
limit of inclination in order to make the platform completely stable. Make sure that the
outriggers rest on stable HORIZONTAL surfaces.

Level the machine chassis perfectly respecting the maximum limit of inclination accep‑
ted, indicated in the USE AND MAINTENANCE MANUAL and visible on the spirit
level.

Before activating any movement, check that there are no obstacles in the work area and
that no‑one is in the trajectory.

It is prohibited to carry out jobs at a distance less than 5 metres from power lines and
electrical equipment.

It is prohibited to operate in unfavourable atmospheric conditions.

It is prohibited to anchor cables, cords or other to the platform and to use the platform as
a lifting device.

It is prohibited to fix ladders, stools or other to the platform basket to increase the work
height.

Always manoeuvre the controls slowly and regularly without reversing movements
abruptly.

Remember that the basket must only be loaded an unloaded FROM THE GROUND.

Do not use the machine at temperatures below ‑20°C and above 40°C. Do not recharge
the batteries at temperatures below 0°C and above 40°C.

BOOM LIFT MODELS X23J

JLG

74

X23JR0620113

Advertising