JLG X23J Operator Manual User Manual

Page 132

Advertising
background image

7.7 P

ERIODIC MAINTENANCE LIMITS

H

ONDA PETROL ENGINE

* First intervention.
** Anyway every 3 months.
*** Anyway every 5 years.

# Anyway every year. If the tightening is not correct replace the nuts with two new with the
same specifications and restore the connection without using oil or grease.

As regards complete service of the engine, see the manual supplied by the engine manufac‑
turer or download it from the website: www.honda‑engines‑eu.com

BOOM LIFT MODELS X23J

JLG

128

X23JR0620113

DETAIL

INTERVENTION

BEFORE

START‑UP

ACCORDING

TO NECESSITY

INTERVAL (HOURS)

10

50

100

250

500

1000

2000

AIR FILTER

CONTROL, CLEANING

REPLACEMENT

ENGINE OIL

CHECK LEVEL

REPLACEMENT

*

SEDIMENT BOWL

CLEANING

FUEL TAK AND NET

CLEANING

HYDRAULIC

OIL

CHECK LEVEL

REPLACEMENT

HYDRAULIC OIL

FILTER

CARTRIDGE

REPLACEMENT

*

ARTICULATED JOINTS

GREASING

*

BATTERY

CHECK ELECTROLYTE

LEVEL

GEARBOX OIL

CHECK LEVEL

REPLACEMENT

*

MACHINE

GENERAL ERIODIC

CONTROL

*

EXTENSION ROPES

AND PULLEYS

CHECK WEAR

**

*

REPLACEMENT

***

COUPLING ELEMENT

SCREWS TIGHTNESS

CONTROL

*

NUT FIXING PINS

BASKET

CHECK TORQUE

200 Nm

#

Advertising