Starting from the transport position operate on every single outrigger as follows:

Lift and keep lifted the blocking pin of the outrigger’s joint winning the power of the
spring;

start rotating the outrigger in order to get it toward the reduced stabilization and release
the pin which will fit in the specially provided seat when the outrigger will be rotated
about 24° compared to the transport position.

To move in the total stabilization position lift and keep lifted the blocking pin of the
outrigger’s joint winning the power of the spring; rotate the outrigger in order to bring it
in the total stabilization position, about 58° compared to the transport position, release
the pin which will fit in the specially provided seat stopping the rotation.

Check always that at the end of the rotation of the outrigger the pin, thanking the action
of the spring, fits in the specially prvided seat STOPPING the joint of the outrigger.

For the opposite operation, follow the above described instructions checking that at the end
of the operation every outrigger is blocked in transport position and cannot be moved but
following the above described operations. As every outrigger is independent of the others,
many different stabilization positions can be achieved. This means that the machine may be
positioned even in the narrowest areas.

Hereby is a diagram of the possible stabilization positions and of their working areas.