JLG X23J Operator Manual User Manual

Page 6

Advertising
background image

6.3

Working area ...........................................................................................Page 75

6.4

Use of the elevating work platform (MEWP) .....................................Page 76

6.4.1

Preliminary checks before starting work ............................................Page 77

6.4.2

Starting the petrol and diesel engine ..................................................Page 78

6.4.3

Starting the electric engine ....................................................................Page 79

6.4.4

Engine turning‑of....................................................................................Page 81

6.4.5

Stopping the motor lithium version.....................................................Page 81

6.4.6

Operative load automatic selection......................................................Page 82

6.4.7

Passage from transport configuration to stabilisation
configuration Standard version ............................................................Page 82

6.4.8

Traversing ................................................................................................Page 86

6.4.9

Jib arm movement for traversing .........................................................Page 88

6.4.10

Parking the machine on slopes or on uneven ground.......................Page 90

6.4.11

Stabilising and levelling the machine ..................................................Page 90

6.4.12

Automatic stabilization and destabilization.......................................Page 94

6.4.13

Track widening........................................................................................Page 96

6.4.14

Basket movement....................................................................................Page 96

6.4.15

Manual levelling of the cage .................................................................Page 102

6.5

Aerial part emergency manoeuvres.....................................................Page 104

6.5.1

Activation of emergency descent from the basket.............................Page 104

6.5.2

Manoeuvre of the machine from the emergency position on the
ground in the case of sudden indisposition of the operator ............Page 105

6.5.3

Activation of the emergency descent in the case of accidental
destabilisation of the machine ..............................................................Page 106

6.5.4

Activation of the emergency descent from the ground in case of operator
indisposition, engine functioning and electric plant broken down.......Page 108

6.5.5

Activation of the emergency descent from the ground with manual
pump if all energy systems should break down ...............................Page 110

6.5.6

Track part emergency manoeuvre: movement of the platform
outriggers with manual pump to allow machine tran sport............Page 112

6.5.7

The manoeuvre illustrated successively must only be performed
with the machine closed ........................................................................Page 113

6.6

Electrical disconnection of the remote control ...................................Page 116

6.7

Recharging the battery...........................................................................Page 117

6.8

Main declared uses of the platform .....................................................Page 121

6.8.1

Plant engineering....................................................................................Page 121

6.8.2

Closed rooms...........................................................................................Page 121

6.8.3

Use for pruning.......................................................................................Page 121

6.8.4

Use for repair and maintenance of roofs and gutters........................Page 122

6.8.5

Use for painting, sanding and plastering............................................Page 122

6.8.6

Use in marine environment...................................................................Page 122

CHAPTER

7

MAINTENANCE....................................................................................Page 123

7.1

Greasing and lubrication specifications ..............................................Page 123

7.2

Table of recommended lubricants ........................................................Page 123

7.3

Greasing points .......................................................................................Page 125

7.4

Greasing the telescopic extension arm ................................................Page 125

7.5

Maintenance safety regulations............................................................Page 126

7.6

Manoeuvre of the machine from the second emergency position from the ground through
the optional second remote control in case of maintenance operations ......Page 127

7.7

Periodic maintenance limits ..................................................................Page 128

7.8

Electric motor ..........................................................................................Page 131

7.8.1

Electric motor maintenance...................................................................Page 131

7.9

Inspection and maintenance .................................................................Page 132

7.10

General periodic control ........................................................................Page 134

7.11

Rubber track maintenance.....................................................................Page 135

7.11.1

Checking track tension...........................................................................Page 135

7.11.2

Operations for loosening/tightening the track ...................................Page 135

7.11.3

Checking the rubber tracks ...................................................................Page 136

7.11.4

Replacing the rubber tracks ..................................................................Page 138

2

X23JR0620113

BOOM LIFT MODELS X23J

JLG

Advertising