149

BOOM LIFT MODELS X23J

JLG

X23JR0620113

6. Completely extend the extensions and retract them by about 30‑40cm.
7. Tighten the bolts of the two output cables so that the threaded terminals come out of
65±3 mm from the rocker arm. During adjustment keep the ropes blocked to prevent
them turning with the nuts. Make use of the relevant seat for the wrench on the cable
socket.

8. Activate the movement of the extendible arms several
times and check that the residual loads on the ropes are
10Nm.
9. This procedure could require several attempts before it is
completed correctly.
10. The adjustment is correct when the ropes do not emit
any noise during extension or return and the torque value
prescribed is reached on all of the ropes
.
11. Once calibration has been concluded, tighten the counter‑
nuts and re‑mount the sump.

DO NOT SUBJECT THE CABLES TO TORSION.

NUTS FOR EXIT CABLES STOP

TERMINAL WITH SEAT FOR ANTI

ROTATION KEY