JLG X23J Operator Manual User Manual
Page 92
It is absolutely forbidden to translate in 2
nd
speed on uneven or not flat grounds and
during not rectilinear motion of the machine.
6.4.9 J
IB ARM MOVEMENT FOR TRAVERSING
To exceed slopes from 10° to 15° in longitudinal direction during the translation phases, it is
necessary to lift the JIB arm.
ONLY PERFORM THIS OPERATION WHEN IT IS REALLY NECESSARY. IN ALL
OTHER SITUATIONS, TRAVERSE WITH THE MACHINE CLOSED AND ALIGNED.
The permission to use the JIB is indicated by the icon in position 5 on remote control.
The JIB lifting arm can only be controlled from a ground station during translation.
Before lifting the jib arm in the traversing phase, the following conditions must be verified:
‑
all outriggers must be lifted from the ground
‑
there must be no operator in the basket
‑
the control position must be that on the ground (the remote control must not be in its
seat in the cage)
‑
the aerial part safety device by‑pass key must not have been activated after the machine
has been closed and aligned.
BOOM LIFT MODELS X23J
JLG
88
X23JR0620113
ATTENZIONE
ATTENZIONE
DANGER
DANGER