JLG X23J Operator Manual User Manual

Page 133

Advertising
background image

129

BOOM LIFT MODELS X23J

JLG

X23JR0620113

PERKINS DIESEL ENGINE

* First intervention.

** Anyway every 3 months.
*** Anyway every 5 years.

Regarding in‑depth maintenance of the engine, see the supplied manufacturer’s maintenan‑
ce.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the

DETAIL

INTERVENTION

BEFORE

START‑UP

ACCORDING TO

NECESSITY

INTERVAL (HOURS)

10

50

100

250

500

1000

2000

DRY AIR FILTER

CONTROL, CLEANING

•

REPLACEMENT

•

ENGINE OIL

CHECK LEVEL

•

•

REPLACEMENT

•

*

•

MOTOR OIL FILTER

CLEANING

•

REPLACEMENT

•

FUEL FILTER

CLEANING

•

REPLACEMENT

•

WATER SEPARATOR

CLEANING AND DRAI‑

NING WATER

•

•

*

•

COOLING SYSTEM

CHECk LIQUID LEVEL

•

LIQUID ADD./REPLA‑

CEMENT

•

HYDRAULIC OIL

CHECK LEVEL

•

REPLACEMENT

•

HYDRAULIC OIL

FILTER

CARTRIDGE

REPLACEMENT

•

*

•

ARTICULATED

JOINTS

GREASING

•

*

•

BATTERY

CHECK ELECTROLYTE

LEVEL

•

•

GEARBOX OIL

CHECK LEVEL

•

REPLACEMENT

•

*

•

MACHINE

GENERAL PERIODIC

CONTROLL

•

•

*

EXTENSION ROPES

AND PULLEYS

CHECK WEAR

•

**

•

*

REPLACEMENT

•

***

COUPLING ELEMENT

SCREWS TIGHTNESS

CONTROL

•

*

•

NUT FIXING PINS

BASKET

CHECK TORQUE

200 Nm

•

#

Advertising