JLG X23J Operator Manual User Manual

Page 133

Advertising
background image

129

BOOM LIFT MODELS X23J

JLG

X23JR0620113

PERKINS DIESEL ENGINE

* First intervention.

** Anyway every 3 months.
*** Anyway every 5 years.

Regarding in‑depth maintenance of the engine, see the supplied manufacturer’s maintenan‑
ce.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the

DETAIL

INTERVENTION

BEFORE

START‑UP

ACCORDING TO

NECESSITY

INTERVAL (HOURS)

10

50

100

250

500

1000

2000

DRY AIR FILTER

CONTROL, CLEANING

REPLACEMENT

ENGINE OIL

CHECK LEVEL

REPLACEMENT

*

MOTOR OIL FILTER

CLEANING

REPLACEMENT

FUEL FILTER

CLEANING

REPLACEMENT

WATER SEPARATOR

CLEANING AND DRAI‑

NING WATER

*

COOLING SYSTEM

CHECk LIQUID LEVEL

LIQUID ADD./REPLA‑

CEMENT

HYDRAULIC OIL

CHECK LEVEL

REPLACEMENT

HYDRAULIC OIL

FILTER

CARTRIDGE

REPLACEMENT

*

ARTICULATED

JOINTS

GREASING

*

BATTERY

CHECK ELECTROLYTE

LEVEL

GEARBOX OIL

CHECK LEVEL

REPLACEMENT

*

MACHINE

GENERAL PERIODIC

CONTROLL

*

EXTENSION ROPES

AND PULLEYS

CHECK WEAR

**

*

REPLACEMENT

***

COUPLING ELEMENT

SCREWS TIGHTNESS

CONTROL

*

NUT FIXING PINS

BASKET

CHECK TORQUE

200 Nm

#

Advertising