JLG X23J Operator Manual User Manual
Page 133
129
BOOM LIFT MODELS X23J
JLG
X23JR0620113
PERKINS DIESEL ENGINE
* First intervention.
** Anyway every 3 months.
*** Anyway every 5 years.
Regarding in‑depth maintenance of the engine, see the supplied manufacturer’s maintenan‑
ce.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the
DETAIL
INTERVENTION
BEFORE
START‑UP
ACCORDING TO
NECESSITY
INTERVAL (HOURS)
10
50
100
250
500
1000
2000
DRY AIR FILTER
CONTROL, CLEANING
•
REPLACEMENT
•
ENGINE OIL
CHECK LEVEL
•
•
REPLACEMENT
•
*
•
MOTOR OIL FILTER
CLEANING
•
REPLACEMENT
•
FUEL FILTER
CLEANING
•
REPLACEMENT
•
WATER SEPARATOR
CLEANING AND DRAI‑
NING WATER
•
•
*
•
COOLING SYSTEM
CHECk LIQUID LEVEL
•
LIQUID ADD./REPLA‑
CEMENT
•
HYDRAULIC OIL
CHECK LEVEL
•
REPLACEMENT
•
HYDRAULIC OIL
FILTER
CARTRIDGE
REPLACEMENT
•
*
•
ARTICULATED
JOINTS
GREASING
•
*
•
BATTERY
CHECK ELECTROLYTE
LEVEL
•
•
GEARBOX OIL
CHECK LEVEL
•
REPLACEMENT
•
*
•
MACHINE
GENERAL PERIODIC
CONTROLL
•
•
*
EXTENSION ROPES
AND PULLEYS
CHECK WEAR
•
**
•
*
REPLACEMENT
•
***
COUPLING ELEMENT
SCREWS TIGHTNESS
CONTROL
•
*
•
NUT FIXING PINS
BASKET
CHECK TORQUE
200 Nm
•
#