Rockwell Automation 9307 FactoryTalk EnergyMetrix User Manual

Page 214

Advertising
background image

FactoryTalk EnergyMetrix Software

214

4. Check Use Intervals to allow the report user to select the report interval from among

Days, Weeks, and Months at report run-time.

5. Enter any comments or notes in the Notes field.

6. Select the Script tab and enter the MPR script in the Script field.

7. To check the validity of the script, click Validate.

Any errors are displayed in the Validation results field at the bottom of the screen.

The Objects link opens the MPR object help topic.

The Quick Ref link opens the MPR scripting quick reference page.

Click the Validate button to check the syntax of the script entered. If syntax errors are
found, a new field opens below the script field indicating the nature and location of the
error.

Advertising