Rockwell Automation 9307 FactoryTalk EnergyMetrix User Manual

Page 88

Advertising
background image

FactoryTalk EnergyMetrix Software

88

4. Click Enter Data.

5. Enter a date and time in the date / time field and click Set to set a common time stamp

for all the tags listed in the window.

6. Enter the desired data for each manual tag.

Data will be scaled by the scale and offset parameters configured in the meter tag
setup.

7. Click Save to store or Cancel to delete without saving.

Set up a Roll-up Meter Tag

Follow these steps to set up a roll-up meter tag:

1. In the Add a Meter Tag window, leave the Meter tag type as Device.

2. Click Select Tag.

Advertising