Gpi/gpo cables installation, 5 gpi/gpo cables installation – Doremi IMS1000 User Manual

Page 42

Advertising
background image

IMS.OM.002949.DRM

Page 42 of 320

Version 1.7

Doremi Labs

Figure 22: RJ-45 to DB25 Converter

4.5 GPI/GPO Cables Installation

Figure 23: GPI/GPO Connectors

● Plug one shielded CAT5 or CAT6 cable end into the connector labeled GPI on the

IMS1000 board (Figure 23). Install a ferrite core clamp near the connector closest to the
IMS1000. Refer to Section 25 for more information on ferrite core clamp installation.

● Plug the other end of the shielded CAT5 or CAT6 cable into whichever automation

controller is available or required.

● Take another shielded CAT5 or CAT6 cable and plug the end into the IMS1000

connector labeled GPO (Figure 23). Install a ferrite core clamp near the connector
closest to the IMS1000. Refer to Section 25 for more information on ferrite core clamp
installation.

● Plug the other end of the shielded CAT5 or CAT6 cable into whichever automation

controller is available or required.

GPI

GPO

Advertising