Daily Start-Up

Prior to start-up, ensure that your cutting environment and that your clothing meet the safety requirements

outlined in the

Safety

section of this manual. If problems occur during start-up, refer to

Section 5

for the

system checkout requirements.

Note: For operation with argon-hydrogen manifold, see

Section 7 Operation: Argon-Hydrogen

Manifold

Check Torch

1. Remove the consumables from the torch and check for worn or damaged parts.

Always place the

consumables on a clean, dry, oil free surface after removing. Dirty consumables can cause the
torch to malfunction.

• Check the pit depth of the electrode using the electrode gauge assembly. An all copper electrode should

be replaced when the depth exceeds .040 inch (1 mm). A SilverPlus electrode should be replaced when

the pit depth exceeds approximately two times the recommended depth of an all copper electrode.

• Wipe the current ring in the torch with a clean paper towel or Q-tip (see Figure 6-7).

• Refer to the

Cut Charts

in this section to choose the correct consumables for your cutting needs.

2. Replace consumable parts. Refer to the

Changing Consumable Parts

section later in this manual for

detailed information on replacing consumables.

3. Ensure that the torch is squared to the material. Refer to

Section 4

: Installation for the torch alignment

procedure.

PLASMA

N

2

/Air

O

2

SHIELD

N

2

/Air

psi

psi

psi

DC

N

2

/Air

O

2

O

2

PLASMA

Cut Flow

PreFlow

PreFlow

Run

10

9

8

7

6

5

4

3

2

1

0

10

9

8

7

6

5

4

3

2

1

0

Test

Preflow

Test

Cutflow

S2

S1

WARNING

Before operating this system, you must read the Safety section thoroughly! Turn main disconnect
switch to the HT2000 power supply OFF before proceeding with the following steps

Turn Gases On

4. Set

S2

toggle switch on the gas console to

Run.

5. Set

S1

on the gas console to

N

2

/Air

(for nitrogen or air as plasma

gas), or

O

2

(for oxygen as plasma gas).

6. Turn the required supply gases

On.

Advertising
This manual is related to the following products: