2 s scan details, Items always completed within s scan, Timesharing items – Yaskawa MP940 User Manual
Page 58

3.3 Scan Processing
3-11
3
3.3.2 S Scan Details
The following diagram shows the internal processing and order of processing of an S scan.
Items Always Completed within S Scan
Timesharing Items
C
N
T
R
L
I
O
HS
SS
BG
R
I
O
C
O
M
R
I
O
SA
HA
LA
S scan cycle (0.5, 1.0, 2.0, or 4.0 ms)
Required
(always completed within scan)
With time limit
(If not completed within 1 scan,
will be executed in next scan.)
Remain-
der
Timer
Back-
ground
pro-
cessing
C
N
T
R
L
I
O
HS
SS
SA
S-scan application (DWG.S)
S-scan system processing
(SVA control loop, etc.)
H-scan system processing (SVA acceleration/
deceleration processing, etc.) (Executed once for
each H scan cycle.)
Local I/O processing (DI/DO/AI/AO)
R
I
O
C
O
M
R
I
O
HA
LA
L-scan application (DWG.L)
H-scan application (DWG.H)
Distributed I/O (MECHATROLINK)
processing (synchronized to either
H or L scan)
Serial communications