Ups and critical load shutdown, Charger control, Using the ups load off pushbutton – Powerware 9390 UPS 100160 kVA User Manual

Page 112

Advertising
background image

UPS OPERATING INSTRUCTIONS

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

9-4

9.1.6

Transfer from Normal to Bypass Mode and Shut Down UPS

To transfer the critical load to Bypass mode and shut down the UPS:

1.

Transfer the critical load to bypass by performing the procedure in
paragraph 9.1.4.

2.

Press the CONTROLS pushbutton on the main menu bar. The System Control
screen appears.

3.

Press the pushbutton to display System Controls Screen 2.

4.

Press the PM OFF pushbutton on the System Controls menu bar.

The power module (PM) status indicates SHUTDOWN

.

The input and output

contactors open, the battery breaker or disconnect is tripped, and the power
module is turned off. The bypass source supplies the critical load.

W

A

R

N

I

N

G

Power is present inside the UPS cabinets.

9.1.7

UPS and Critical Load Shutdown

To perform maintenance or service on the critical load, shut down power to the load
by performing the following procedure:

1.

Turn off all equipment that is being powered by the UPS.

2.

Perform the LOAD OFF procedure in paragraph 9.1.9.

The input, output, and bypass backfeed contactors open, the battery breaker or
disconnect is tripped, and the power module is turned off.

W

A

R

N

I

N

G

Power is present inside the UPS cabinet until the upstream input feeder circuit breaker is opened.

3.

Open the UPS input and bypass (if dual feed) feeder circuit breakers.

9.1.8

Charger Control

To turn the battery charger on or off:

1.

Press the CONTROLS pushbutton on the main menu bar. The System Control
screen appears.

2.

Press the pushbutton to display System Controls Screen 2.

3.

Press the CHGR ON or CHGR OFF pushbutton on the System Controls menu bar to
toggle the charger on or off.