Chapter 6 installing optional accessories, 1 installing a powerware hot sync® can bridge card, Installing optional accessories – Powerware 9390 UPS 100160 kVA User Manual

Page 43: Installing a powerware hot sync can bridge card, Figure 6‐1. powerware hot sync can bridge card, Chapter 6, “installing options and accessories, 1 installing a powerware hot sync, Can bridge card

Advertising
background image

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

6-1

Chapter 6

Installing Optional Accessories

This chapter contains installation instructions for the following options:

S

Powerware Hot Sync

®

CAN Bridge Card and parallel system control wiring

S

Remote Monitor Panel (RMP)

S

Relay Interface Module (RIM)

S

Supervisory Contact Module (SCM)

6.1

Installing a Powerware Hot Sync

®

CAN Bridge Card

As an option, a Powerware Hot Sync

®

CAN Bridge Card (shown in Figure 6‐1), can be

installed to provide connectivity for operational mode control and metering of a
parallel system at any uninterruptible power module (UPM) in the system. In addition,
this card can be used to connect optional system monitoring devices, such as an
RMP, RIM, or SCM, to the UPS.

Plug-in Terminal Block J3

Figure 6‐1. Powerware Hot Sync

®

CAN Bridge Card

NOTE Only one Powerware Hot Sync

®

CAN Bridge Card can be installed in the UPS. Multiple CAN cards

are not supported and will cause system conflicts.

To install a Powerware Hot Sync

®

CAN Bridge Card:

1.

Verify the UPS system is turned off and all power sources are removed. See
Chapter 9, “UPS Operating Instructions,” for shutdown instructions.

2.

If not already open, unfasten the front door latch and swing the door open.

3.

Remove the X-Slot cover.

4.

See Drawing 164201603-8 starting on page A-42 for location of the X-Slot
communication bay.

Figure

Advertising