INSTALLING THE UPS SYSTEM

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

4-12

Installation Checklist

- All packing materials and restraints have been removed from each cabinet.

- Each cabinet in the UPS system is placed in its installed location.

- The front shipping bracket is installed and adjusted.

- A cabinet grounding/mounting kit is installed between any cabinets that are bolted together.

- All conduits and cables are properly routed to the UPS and any ancillary cabinets.

- All power cables are properly sized and terminated.

- Neutral conductors are installed or bonded to ground as per requirements.

- Battery cables are terminated on E4 (+) and E5 (-).

- Battery UV trip and Aux contact signal wiring is connected from the UPS to the battery breaker.

- LAN and telephone drops are installed.

- All telephone and LAN connections have been completed.

- A ground conductor is properly installed.

- Air conditioning equipment is installed and operating correctly.

- The area around the installed UPS system is clean and dust‐free. (Eaton recommends that the UPS be installed on a

level floor suitable for computer or electronic equipment.)

- Adequate workspace exists around the UPS and other cabinets.

- Adequate lighting is provided around all UPS equipment.

- A 120 Vac service outlet is located within 7.5 meters (25 feet) of the UPS equipment.

- The REPO device is mounted in its installed location and its wiring is terminated inside the UPS cabinet. The REPO

switch must be a latching‐type switch with a dedicatd circuit.

- The normally-closed (NC) Emergency Power-off contact (pins 1 and 2 on TB1) is jumpered if not used.

- Alarm relays and building alarms are wired appropriately. (OPTIONAL)

- A remote battery disconnect control is mounted in its installed location and its wiring is terminated inside the UPS and

battery c abinet. (OPTIONAL)

- Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (OPTIONAL)

- The debris shield covering the UPS cabinet ventilation grill is removed.

- Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.