POWER WIRING INSTALLATION NOTES

071608

D

164201603-5

DESCRIPTION:

DATE:

DRAWING NO:

SHEET:

REVISION:

INSTALLATION INFORMATION

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

A-11

Table E. INPUT/OUTPUT Ratings & External Wiring Requirements for the Powerware 9390-40/20

Units

Rating 50/60 Hz

Basic Unit Rating at 0.9 lagging
pF load

kVA

kW

20
18

20
18

20
18

20
18

20
18

Input and Bypass Input
Output

VOLTS
VOLTS

208/220
208/220

380
380

400
400

415
415

480
480

AC Input to UPS Rectifier
(0.98 min. pF)
Full Load Current plus Battery
Recharge Current
(3) Phases, (1) Ground

A

Amps

60

34

33

32

30

Minimum Conductor Size
Number per Phase

AWG or kcmil

(each)

2

(1)

6

(1)

6

(1)

6

(1)

6

(1)

AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Neutral-if required,
(1) Ground

B

Amps

56/53

31

29

28

24

Minimum Conductor Size
Number per Phase

AWG or kcmil

(each)

2

(1)

6

(1)

6

(1)

6

(1)

6

(1)

DC Input from Battery to UPS
(1) Positive, (1) Negative

C

Vdc

Amps@

(2.0V/cell)

384-480

51

432-480

51

432-480

51

432-480

51

432-480

51

Minimum Conductor Size
Number per Pole

AWG or kcmil

(each)

2

(1)

2

(1)

2

(1)

2

(1)

2

(1)

AC Output to Critical Load
Full Load Current
(3) Phases, (1) Neutral-if required,
(1) Ground

D

Amps

56/53

31

29

28

24

Minimum Conductor Size
Number per Phase

AWG or kcmil

(each)

2

(1)

6

(1)

6

(1)

6

(1)

6

(1)

Neutral Bonding Jumper
Minimum Conductor Size
Number (See Note 7)

-

AWG or kcmil

(each)

4

(1)

6

(1)

6

(1)

6

(1)

6

(1)

NOTE Callout letters

A

,

B

,

C

, and

D

map to Drawing 164201603-4, sheets 1 of 5,

3 of 5, 4 of 5, and 5 of 5.

Read and understand the following notes while planning and performing the installation:

1.

Refer to national and local electrical codes for acceptable external wiring practices.

2.

Material and labor for external wiring requirements are to be provided by designated
personnel.

3.

For external wiring, use 90

C copper wire. See the appropriate information in Table E

through Table J. Wire sizes are based on using the specified breakers.

4.

Wire ampacities are chosen from Table 310-16 of the NEC. Wire is 90

C specification.

5.

If installing, as part of the UPS system, a maintenance bypass without a rectifier input
breaker, a minimum of two separate feeds with upstream feeder breakers, or one feed with
two upstream feeder breakers, must be provided: one for the UPS and one for the
maintenance bypass input. DO NOT use one feed or a single‐feeder breaker to supply
both the UPS and the maintenance bypass.