INSTALLING THE UPS SYSTEM

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

4-13

Parallel System Installation Checklist

- Each cabinet in the parallel system is placed in its installed location.

- All conduits and cables are properly routed to the UPMs and to the parallel tie or distribution cabinet.

- All power cables are properly sized and terminated.

- The bypass source feeding the optional bypass of the parallel tie cabinet and the UPMs is from the same source of

supply and is a four-wire wye configuration.

- Neutral conductors are installed or bonded to ground as per requirements.

- A ground conductor is properly installed.

- Controller Area Network (CAN) wiring between the UPMs is properly installed.

- Pull chain wiring between the UPMs is properly installed.

- Adequate workspace exists around the UPMs, parallel tie cabinet, and other cabinets.

- Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.