INSTALLING THE UPS SYSTEM

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

4-8

22. Route and connect the battery cables between the UPS and battery cabinets in

accordance with the instructions in the Powerware 9390 Integrated Battery
Cabinet (Models IBC-S and IBC-L) Installation Manual
. See Appendix A for UPS
cabinet wiring access information.

23. Connect the positive, negative, and ground DC power wiring from the battery

cabinet to the UPS cabinet battery terminal block and ground terminals. See
Appendix A for wiring and termination requirements.

24. After wiring the UPS system to the facility power and critical load, be sure to

ground the system according to local and/or national electrical wiring codes.

25. If wiring interface connections, proceed to paragraph 4.8; otherwise, proceed to

Step 26.

26. When all wiring is complete, reinstall the safety shield panels removed in

previous steps. Secure with the retained hardware.

27. Close the control panel door and secure with the retained hardware.

28. Reinstall the door removed in paragraph 4.2 and secure with the retained

hardware.

29. Close the door and secure the latch.

4.8

Installing Interface Connections

4.8.1

TB1 and TB2 Connections

NOTE When installing interface wiring for TB1 and TB2 connections, conduit must be installed between
each device and the UPS cabinet.

To install wiring to connections:

1.

Verify the UPS system is turned off and all power sources are removed. See
Chapter 9, “UPS Operating Instructions,” for shutdown instructions.

2.

If not already open, unfasten the front door latch and swing the door open.

3.

If not already removed, remove the door. Remove the retaining screw located
inside the door at the bottom hinge pivot point, then lift the door off. Retain the
hardware for later use.

4.

Remove the screws securing the control panel door and swing the door open.
Retain the hardware for later use.

5.

Remove the screws securing the top internal safety shield panel. Remove the
panel to gain access to the TB1 and TB2 terminal blocks and the top conduit
landing plate (see Drawing 164201603-8 starting on page A-42). Retain the
hardware for later use.

6.

If installing interface wiring from the bottom of the cabinet, proceed to Step 7;
otherwise, proceed to Step 8.

7.

Remove the screws securing the bottom internal safety shield panel and remove
the panel to gain access to the bottom conduit landing plate.

8.

Remove the UPS cabinet top or bottom conduit landing plate to drill or punch
conduit holes (see Drawing 164201603-6 on page A-34).