10 initial startup, 11 completing the installation checklist, Tb2 battery cabinet connections – Powerware 9390 UPS 100160 kVA User Manual

Page 37

Advertising
background image

INSTALLING THE UPS SYSTEM

EATON Powerware

®

9390 UPS (20–80 kVA) Installation and Operation Manual

S 164201603 Rev 2 www.powerware.com

4-11

8.

Reinstall the door removed in Step 3 or paragraph 4.2 and secure with the
retained hardware.

9.

Close the door and secure the latch.

10. Refer to the manual supplied with the X-Slot card for operator instructions.

4.9

Installing Accessories and Parallel System Control Wiring

To install an optional Remote Emergency Power-off control, see Chapter 5, “Installing
a Remote Emergency Power-off Control.” To install optional accessories, see
Chapter 6, “Installing Options and Accessories.” To install parallel system control
wiring, see Chapter 6, “Installing Options and Accessories.”

4.10

Initial Startup

Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page 15-1 become void. This
service is offered as part of the sales contract for the UPS. Contact service in advance
(usually a two-week notice is required) to reserve a preferred startup date.

4.11

Completing the Installation Checklist

The final step in installing the UPS system is completing the following installation
checklist. This checklist ensures that you have completely installed all hardware,
cables, and other equipment. Complete all items listed on the checklist to ensure a
smooth installation. Make a copy of the installation checklist before filling it out, and
retain the original. If installing a parallel system, complete the parallel system
installation checklist in addition to the installation checklist.

After the installation is complete, an authorized Eaton Customer Service Engineer
must verify the operation of the UPS system and commission it to support the critical
load. The Eaton service representative cannot perform any installation tasks other
than verifying software and operating setup parameters. Eaton service personnel may
request a copy of the completed installation checklist to verify all applicable
equipment installations have been completed.

NOTE The installation checklist MUST be completed prior to starting the UPS system for the first time.

Advertising