Chapter 8 calibration, 1 operating procedures on the calibration screen – Yokogawa DAQWORX User Manual

Page 174

Advertising
background image

8-1

IM WX102-01E

1

2

3

4

5

6

7

8

9

10

11

Index

Calibration

8.1

Operating Procedures on the Calibration
Screen

Displaying the calibration screen

Calibration is done using the Software Configurator.

After selecting the project, click the Software Configurator from the launcher software or

right-click the launcher icon on the task bar and select Start Software Configurator.

The Software Configurator starts.

Clicking the Calibration tab displays the calibration screen, below.

Calibration tab

Connect button

Calibration procedures

There are two ways to perform calibration.
• Auto: Apply the specified voltage to the terminal displayed on the screen, and

calibrate all channels based on that input signal.

• Manual: Calibrate by setting a calibration value for each channel.

Chapter 8

Calibration

Advertising
This manual is related to the following products: