Table 51 Required route list (3DC Multi-Target (Cnt Ac-S Z x Cnt Ac-J Z) configuration) (continued)

Route list needed in Business Continuity Manager

Remote site
condition

Local site
condition

Primary site
condition

Host on which Business
Continuity Manager is
started

Remote

→ Primary

Usable

Unusable

Usable

None

Usable

Usable

Unusable

Usable

Unusable

Unusable

Legend:

Usable: The target site can be used.

Unusable: The target site cannot be used because of an error.

# Required only if the Continuous Access Synchronous Z Consistency Preservation
Function is used.

Table 52 (page 179)

shows how to prepare the configuration files at each site.

Table 52 How to Prepare the Configuration Files at Each Site (3DC Multi-Target (Cnt Ac-S Z x Cnt
Ac-J Z) configuration)

How to Prepare

Contents

File Type

At the Secondary Site

At the Local Site

At the Primary Site

Transfer from the
primary site

Transfer from the
primary site

Perform a local scan

The primary site configuration

Disk
configuration
definition file

Transfer from the local
site

Perform a local scan

Transfer from the
local site

The local site configuration

Perform a local scan

Transfer from the
remote site

Transfer from the
remote site

The remote site configuration

Defining a 3DC Multi-Target (Cnt Ac-S Z x Cnt Ac-J Z) configuration