Preparing the hardware (hyperswap) – HP XP Racks User Manual

Page 215

Advertising
background image

Figure 89 Example of a 2DC configuration with HyperSwap and Cnt Ac-J Z

Preparing the hardware (HyperSwap)

Table 64 (page 216)

lists the prerequisite hardware and Table 5-19 provides the storage system

settings for using Business Continuity Manager in a 2DC configuration with HyperSwap and Cnt
Ac-J Z.

Defining a 2DC configuration with HyperSwap and Cnt Ac-J Z

215

Advertising
This manual is related to the following products: