If pair status changes to nodelta – HP XP Racks User Manual

Page 450

Advertising
background image

3.

Execute the YKRESYNC PREPARE command for the delta resync pair.

YKQUERY

YKRESYNC PREPARE

YKEWAIT GOTO(HOLD) NOINVALIDCHECK

If the command is successful, the delta resync pair between the local and remote sites first
changes to the HOLDTRNS status, and then the HOLD status. After changing to the HOLD
status, the copy pair is ready for delta resync.

If the pair stays in the HOLDTRNS status and does not change to the HOLD status, execute
the procedure in

“Managing the HOLDTRNS Status” (page 446)

and

“When Copy Pairs Do

Not Change to HOLD Status” (page 447)

.

If Pair Status Changes to NODELTA

If a copy pair changed to NODELTA status after performing delta resync, delta resync could not
be performed because there is an anomaly in the differential update between the local site and
the remote site.

To create a Cnt Ac-J Z copy pair between the local site and the remote site, execute delta resync
with full copy (YKRESYNC ALLJNL command) specified to issue a full copy of the volumes in the
local site to the remote site. The following is the procedure for performing a full copy. Performing
this action copies all data in the local site to the remote site.

1.

Confirm the copy pair status by using the YKQUERY command, and then execute the YKRESYNC
ALLJNL ERRCHK

command for the delta resync pair.

YKQUERY

YKRESYNC ALLJNL ERRCHK

450 Maintenance and troubleshooting operations

Advertising
This manual is related to the following products: