Failback – HP XP Racks User Manual

Page 403

Advertising
background image

3.

Start operation at remote site 1.

Operation in a 2DC configuration is performed between remote site 1 and the primary site.

Failback

1.

Recover the host at the primary site from the failure.

2.

Stop operation at remote site 1.

3.

From the primary site, execute the YKSUSPND FORWARD command for the Continuous Access
Journal Z copy pair between the primary site and remote site 1.

YKQUERY

YKSUSPND FORWARD

YKEWAIT GOTO(SUSPEND)

Using a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration 403

Advertising
This manual is related to the following products: