Failback – HP XP Racks User Manual
Page 403
Advertising

3.
Start operation at remote site 1.
Operation in a 2DC configuration is performed between remote site 1 and the primary site.
Failback
1.
Recover the host at the primary site from the failure.
2.
Stop operation at remote site 1.
3.
From the primary site, execute the YKSUSPND FORWARD command for the Continuous Access
Journal Z copy pair between the primary site and remote site 1.
•
YKQUERY
•
YKSUSPND FORWARD
•
YKEWAIT GOTO(SUSPEND)
Using a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration 403
Advertising
This manual is related to the following products: