Preparing – HP XP Racks User Manual
Page 498
Advertising

Preparing
1.
From the primary site, execute the YKSUSPND command for the Continuous Access Journal Z
EXCTG.
•
YKQUERY
•
YKSUSPND
•
YKEWAIT GOTO(SUSPEND)
2.
Start remote site storage system maintenance.
Change the configuration to a 2DC configuration in which operation is performed from the
primary site.
498 Maintenance and troubleshooting operations
Advertising
This manual is related to the following products: