background image

YKQUERY

YKRESYNC DELTAJNL

YKEWAIT GOTO(DUPLEX)

After the commands finish successfully, the Cnt Ac-J Z copy pairs between the primary storage
system and the remote storage system are automatically moved to the HOLD status.

5.

Start primary storage system maintenance.

Operation in a 2DC configuration is performed on the local storage system.

Failback

To perform a failback:
1.

Finish the primary storage system maintenance.

2.

Use TPC-R on the primary host to restart the copying of the Cnt Ac-S copy pairs with the
HyperSwap attribute.

Cnt Ac-S copy pairs with the HyperSwap attribute are moved from the SWAPPING status to
the DUPLEX status.