Idm unit design guidelines, Minimum clearance requirements – Rockwell Automation MDF-SB1304F Kinetix 6000M Integrated Drive-Motor System User Manual
Page 26

26
Rockwell Automation Publication 2094-UM003A-EN-P - May 2012
Chapter 2
Planning the Kinetix 6000M System Installation
Figure 7 - Minimum IPIM Module Clearance Requirements
IDM Unit Design Guidelines
Minimum Clearance Requirements
illustrates minimum IDM unit clearance requirements for proper
airflow and installation.
Additionally, consider the following items:
• Obtain the specified motor thermal rating by mounting the motor on a
surface with heat dissipation equivalent to a 304.8 x 304.8 x 12.7 mm
(12 x 12 x 0.5 in.) aluminum heatsink.
• Do not install the motor in an area with restricted airflow, and keep other
heat producing devices away from the motor.
Clearance right of the
module is not required
(1)
50.8 mm (2.0 in.) clearance for
airflow and installation
Clearance left of the
module is not required
(1)
Power Rail
(2094-PRSx)
50.8 mm (2.0 in.) clearance for
airflow and installation
(1) The power rail (slim), catalog number 2094-PRSx, extends left and right of the first and last module 5.0 mm (0.20
in.). The Bulletin 2094-PRx power rail extends approximately 25.4 mm (1.0 in.) left of the IAM module and right of
the last module mounted on the rail.
(2) Dimension applies to the following modules:
IPIM module
2094-SEPM-B24-S
IAM module (Series B) 2094-BC01-Mxx-x and 2094-BC02-M02-x
AM module (Series B) 2094-BMP5-x, 2094-BM01-x, 2094-BM02-x
287 mm
(11.3 in.)
(2)
BURN HAZARD: Outer surfaces of the motor can reach high temperatures,
125 °C (275 °F), during motor operation.
Take precautions to prevent accidental contact with hot surfaces. Consider IDM unit
surface temperature when selecting motor mating connections and cables.
Failure to observe these safety procedures could result in personal injury or
damage to equipment.