Rockwell Automation MDF-SB1304F Kinetix 6000M Integrated Drive-Motor System User Manual

Page 84

Advertising
background image

84

Rockwell Automation Publication 2094-UM003A-EN-P - May 2012

Chapter 6

Configuring the Kinetix 6000M System

6. Select the desired Test (Marker/Feedback/Command & Feedback) to

verify connections.
The Online Command dialog box opens. Follow the on-screen test
instructions. When the test completes, the Command Status changes from
Executing to Command Complete.

7. Click OK.

The Online Command - Apply Test dialog box opens (Feedback and
Command & Feedback tests only). When the test completes, the
Command Status changes from Executing to Command Complete.

8. Click OK.
9. Determine if your test completed successfully.

If

Then

Your test completes successfully, this dialog box opens.

1. Click OK.
2. Remove Hardware Enable Input signal

(1)

.

3. Go to Tune the Axes on

page 85

.

(1) The hardware enable input for IDM units is on the IPIM module.

Your test failed, this dialog box opens.

1. Click OK.
2. Verify the Bus status indicator turned

solid green during the test.

3. Verify that the Hardware Enable Input

(1)

signal is applied to the axis you are
testing.

4. Verify conversion constant entered in the

Conversion tab.

5. Return to main

step 6

and run the test

again.