Commissioning – Parker Products COMPAX-M /-S (L) User Manual

Page 11

Advertising
background image

Commissioning

11

After 24V DC of control voltage is switched on, COMPAX has two statuses
available once the initialization phase has been completed:
1. COMPAX is OFF

COMPAX is not configured (P149="0") or
with COMPAX XX70:
I12="0" (final stage blocked).
Now configure COMPAX (e.g. using the ServoManager / ParameterEditor).
Set P149="1"
Configuration is accepted with VC and VP of COMPAX.

2. COMPAX displays error E57

COMPAX is configured (P149="1"). However, operating voltage is not present.
Check COMPAX configuration

*

.

Alterations are accepted with VC and VP of COMPAX.

*)

Configuring

a) Using ServoManager:

P149="1", VP and VC are transferred when being downloaded to COMPAX
from the ServoManager.

b) Using hand-held terminal:

P149="1", VP and VC are generated by the hand-held terminal.

c) Without an auxiliary device, e.g. a terminal:

P149="1", VP and VC must be transmitted after COMPAX configuration.

Switch on operating voltage
With E57:

acknowledge error by pressing Enter.

When OFF: command: "OUTPUT O0=0" or

switch 24V DC on / off

Motor is powered; COMPAX display shows "RUN".

Flow chart:

connection of control

voltage 24 V DC

initializing stage

COMPAX configured
(P149="1")

COMPAX not configured

(P149="0")

error E57

in COMPAX

display

OFF in

Display

check

configuration

execute

configuration

VC, VP

P149="1",

VC, VP

connect
DC bus
voltage

clear

error E57

24V DC

ON / OFF

connect

DC bus

voltage

OUTPUT

O0="0"

RUN

motor enabled

Advertising