Unpacking the quaternary pump, Damaged packaging, Delivery checklist – Agilent Technologies Quaternary Pump 1100 Series User Manual

Page 17

Advertising
background image

17

Installing the Pump

Unpacking the Quaternary Pump

Unpacking the Quaternary Pump

Damaged Packaging

Upon receipt of your quaternary pump, inspect the shipping containers for
any signs of damage. If the containers or cushioning material are damaged,
save them until the contents have been checked for completeness and the
quaternary pump has been mechanically and electrically checked. If the
shipping container or cushioning material is damaged, notify the carrier and
save the shipping material for the carrier’s inspection.

C A U T I O N

If there are signs of damage to the quaternary pump, please do not attempt to
install the quaternary pump.

Delivery Checklist

Ensure all parts and materials have been delivered with the quaternary pump.
The delivery checklist is shown in Table 2. To aid in parts identification,
please see Chapter 5 “Parts and Materials”. Please report missing or damaged
parts to your local Agilent Technologies sales and service office.

Table 2

Quaternary Pump Checklist

Description

Quantity

Quaternary pump

1

Solvent cabinet

1 (5062-8581)

Solvent bottles

4 (3 transparent 9301-1420, 1 amber 9301-1450)

Bottle head assembly

4 (G1311-60003)

Waste tube, purge valve

1 (5042-2461, reorder number, 5m)

Vacuum degasser

1

Solvent tubes for the
degasser

4 (G1322-67300)

Power cables

2

Advertising