Initialize and setup, Overview, Chapter 2 — initialize and setup -1 – Avaya P580 User Manual

Page 59: Overview -1

Advertising
background image

Avaya P550R, P580, P880, and P882 Multiservice Switch User Guide, Version 5.3.1

2-1

2

Initialize and Setup

Overview

The following information and procedures that are provided in this
chapter are common to both layer 2 and layer 3 module
configuration:

Setting Up Your Laptop or PC Monitor

Configuring the Supervisor Module Using the CLI

Configuring the Switch Using the Web Agent

Configuring Custom Access Types

Configuring User Accounts

Remote Authentication Dial-In User Service (RADIUS) Client
Support

Changing the Console Serial Port Settings

Configuring Dial-Up Networking

Changing the TCP Ports for HTTP and Telnet

Managing Configuration Files

* Note: The last step in each procedure tells you to click Apply to

save any setup or changes you made. This saves the
setup or any changes to the Running config only. The
Startup config has not changed. Therefore, these and
other changes will be lost if your switch goes down or if
you power it off.

To save these changes to the Startup Config, you must
copy the Running config to the Startup config. Refer
to the "Copying Configuration Files" section later in this
chapter.

Advertising
This manual is related to the following products: