Fujitronic Programmable Operation Display UG520H-x User Manual

Page 55

Advertising
background image

1 - 46

Self-Loop Test

CTS

NG

OK

RTS

Self-Loop Test

CTS

NG

OK

RTS

CN1

RS-232C

MJ1

RS-485

MJ2

Communication Port

Self-Loop Test

CTS

NG

OK

RTS

Self-Loop Test

CTS

NG

OK

RTS

Self-Loop Test

CTS

NG

OK

RTS

Self-Loop Test

CTS

NG

OK

RTS

Signal Test of RS-485 in CN1

Select [CN1] and [RS-485] in [Communication Port] by pressing each switch.

Loop-back Test

Check the signals, [SD] and [RD].

1

Jump each pin, 12 and 24, 13 and 25 of CN1.

2

The test is OK, if the [OK] lamp turns on when the [Self-Loop Test] switch is pressed.

*

If the [NG] lamp turns on when the same switch as above is pressed, ask the

advice of your distributor.

Test of CTS/RTS

Check the signals, [CTS] and [RTS].

1

Jump each pin, 14(+RTS) and 19(+CTS), 17(-RTS) and 18(-CTS) of CN1.

2

The test is OK if the [CTS] lamp and the [RTS] lamp turn on at the same time that the [RTS] switch

is pressed. Similarly, the test is OK if the [CTS] turns off at the same time that the [RTS] is turned off.

17 Operation of POD Main Menu

Advertising