Fujitronic Programmable Operation Display UG520H-x User Manual

Page 56

Advertising
background image

1 - 47

Signal Test of RS-232C in MJ1 and MJ2

Select [MJ1] (or [MJ2]) and [RS-232C] in [Communication Port] by pressing each switch.

Loop-back Test

Check the signals, [SD] and [RD].

Execute the test by connecting the data transfer cable (UG00C-T) to CN1.

1. Set the adaptor, ADP25-9, which is attached to UG00C-T, to UG00C-T. And connect the modular

jack side of UG00C-T to MJ1 (or MJ2), ADP25-9 side of UG00C-T to CN1.

2. The test is OK, if the [OK] lamp turns on when the [Self-Loop Test] switch is pressed.

*

If the [NG] lamp turns on when the same switch as above is pressed, ask the

advice of your distributor.

Signal Test of RS-485 in MJ1 and MJ2

When you execute the signal test of RS-485 in MJ1 and MJ2, ask the advice of your distributor.

Self-Loop Test

CTS

NG

OK

RTS

Self-Loop Test

CTS

NG

OK

RTS

CN1

MJ1/2

UG00C-T

CN1

RS-232C

MJ1

RS-485

MJ2

Communication Port

17 Operation of POD Main Menu

Advertising