Fujitronic Programmable Operation Display UG520H-x User Manual

Page 93

Advertising
background image

2 - 24

8 MITSUBISHI PLC

2

PLC

D-sub 25pin(Male: )

D-sub 25pin(Male: )

FG

SG

1

7

12

13

14

17

2

7

15

SG

16

4

17

5

18

20

21

3

18

19

24

25

POD (CN1)

+SD

-SD

+RTS

-RTS

-CTS

+CTS

+RD

-RD

+RxD

+TxD

+DSR

+DTR

-RxD

-TxD

-DSR

-DTR

*

Use twist shielded cables.

Wiring

The following is a diagram to show the wiring of the cable which connects POD to PLC.

(connection of the UG200C-M)

RS-422

Wiring Diagram 1

According to our noise tests, the attachment of a ferrite core improves

noise voltage by 650~900V and aids in preventing communication errors.

Note

In case of direct connection with the CPU port of A/QnA series, be sure to attach the

ferrite core to the cable between POD and the CPU port of A/QnA series for noise.

A Ferrite core is sold as an optional accessory.

A noise filter(ferrite core) is sold as an optional accessory. When you buy it, specify

“ZCAT032-0930” as the model name.

In consideration of such noise problems, it is recommended that the standard type link

unit be used in such a case when the cable length of more than 15m is required.

POD

A/QnA Series

CPU

Ferrite core

Advertising