Preparing the hardware (cnt ac-j z attime suspend) – HP XP Racks User Manual

Page 285

Advertising
background image

Figure 106 Example of a Configuration for Using the Cnt Ac-J Z ATTIME Suspend Function

Preparing the hardware (Cnt Ac-J Z ATTIME Suspend)

Table 88 (page 285)

lists the prerequisite hardware and

Table 89 (page 286)

lists the hardware

settings for using Business Continuity Manager in the Cnt Ac-J Z ATTIME suspend function.

Table 88 Prerequisite Hardware (Cnt Ac-J Z ATTIME Suspend)

Remarks

Description

Item

Install a host machine at the primary site. If copy
group operations need to be performed from the

Host

secondary site, also install a host machine at that
site.

The maximum number of storage systems for each site
depends on the storage systems. Configuration

Primary site: one or more XP12000/XP10000,
XP24000/XP20000, XP P9500 disk arrays, or
XP7 storage.

Storage system

limitations may exist. Consult your HP Representative

Secondary site: one or more XP12000/XP10000,
XP24000/XP20000, XP P9500 disk arrays, or
XP7 storage.

for detailed information about the availability of specific
features for the array models being used.

Establish a bidirectional physical path using
appropriately configured fiber channel ports
between the primary site and the secondary site.

Link between storage
systems (physical path)

Defining a configuration so that the Cnt Ac-J Z ATTIME Suspend function can be used 285

Advertising
This manual is related to the following products: