Replacing the oc-3 atm long wave transceiver, Removing the oc-3 atm long wave sfp transceiver, Replacing the oc-3 atm long wave transceiver -27 – McDATA ULTRANETTM EDGE STORAGE ROUTER 3000 User Manual

Page 305: Oc-3 atm long wave sfp transceiver

Advertising
background image

12

Hardware Maintenance

12-27

Replacing the OC-3 ATM Long Wave Transceiver

Replacing the OC-3 ATM Long Wave Transceiver

This section provides procedures for both removing and installing
the OC-3 ATM long wave transceiver.

Tools required:

No special tools are required.

CAUTION

Attach a wrist strap and follow ESD procedures during the
handling of all electronic components.

The transceivers are hot swappable, which means they can be
replaced while the Edge unit is in operation.

Removing the OC-3
ATM Long Wave SFP
Transceiver

The OC-3 ATM long wave transceiver has a blue plastic body with a
plain metal clasp. Use the following procedure to remove the
transceiver from the interface card.

Removing the Plain

Metal Clasp

Transceiver

1. Remove the fiber optic cabling from the transceiver.

2. Lift the metal clasp up.

3. Carefully pull the transceiver out of the interface card.

CAUTION

Laser radiation is invisible and can damage the eye.
Unterminated optical connectors may emit laser radiation.
Do not view the beam with the naked eye or with optical
instruments. Dust caps and dust covers MUST be left in
place on all unterminated bulkhead receptacles and on the
end of every radiating fiber jumper.

Advertising